Schaefer Road Reconstruction & Drainage Ph. 1 - Schertz, TX

Client

Bexar County Flood Control

RHSI Role

Construction Inspection

RHSI provided full time on-site construction inspection services on this project that was meant to alleviate flooding along Schaefer Road and the surrounding residential properties and widen both the roadway and sidewalks. The scope of work included the construction of 3,045 LF of open earth channels, 6,000 LF of 8'x8' and 12'x8' underground concrete single storm drain box sewer line, an outfall system comprising a 144" diameter corrugated metal storm sewer pipe and a composite (gabion and concrete riprap) outfall structure at Cibolo Creek and the reconstruction of Schaefer Road with concrete curb and stormwater drain inlets.